Loading page content…
Loading page content…
have strategic oversight and management of a Key Route Network that constitutes almost 400 miles of Public Highway. It is the responsibility of TfGM, working with the ten Greater Manchester Local Authorities, to strive to help minimise delays, reduce congestion and improve safety across the region's highways. TfGM has recognised the number of low bridges across the region and the risks that collisions of high vehicles with bridges pose to both the integrity of bridges and to the safety of the vehicle occupants alongside other road users. TfGM need x2 such installations to be urgently installed at sites in Salford and in Bolton. TfGM have therefore chosen to direct award the installation of this equipment, including a 10 year warranty to the supplier noted. This direct award is via the RM6347 Transport Technology framework.
Create a free account to read the full notice and search for similar work. When you need help writing and reviewing a bid, you can choose a paid plan. No card needed to start searching.
Continue with this notice →