Loading page content…
Loading page content…
This contract requires a suitably qualified auditor to complete Gas Quality Audits, supplementing the in-house quality assurance team. Post Service Audits will be undertaken as required, encompassing post inspections within 4 weeks of the annual inspection being completed, involving a full strip down of the serviceable appliances (SMBC service tenants appliances connected to a flue) and a visual inspection of flueless appliances owned by the tenant. As well as annual inspections and as part of our on-going maintenance, Sandwell MBC carry out a significant number of boiler replacements per year. Post inspection audits may also be required on new installations to make sure that they are compliant with the current gas regulations, building regulations inc. boiler plus and any specific SMBC’s specification requested. The audits will need to be carried out by a suitably qualified officer, who in addition to the ACS (CCN1 (CPA1), CENWAT, HTR1, CKR1, DAH1), must hold a suitable assessor/auditor’s qualification - (A1, A2 (D32, D33) or similar (e.g. TAQA) and have at least 7 years’ experience in the gas industry. Included in the price for both types of audit, will be an assessment of all c
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →