Loading page content…
Loading page content…
Access track improvements including installation of drainage to be completed by the end of September 2026. Location: Rodney Stoke, Mendip, Somerset ● Excavate a trench down the centre of the track and install 300mm perforated pipe. ● Install spurs at 10 metre intervals at 45 degrees to catch run off on track. ● Connect into existing ditch at the bottom of stone track ● Backfill central trench with clean drainage stone ● Resurface the track either side of the trench to be durable to take agricultural machinery (specific material in tender response); spurs should be concrete lined or similar to enable easy maintenance.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →