Loading page content…
Loading page content…
This Contract Award Notice is issued in accordance with the Procurement Act 2023 to notify the market of the intention to award a contract and to formally commence the standstill period for Design and Build of Depot Fire Hydrants at 2 locations (Queens Park and Triangle Sidings) The currently installed hydrant systems at certain depots do not meet current regulations and British Standards (BS) due to the age of the systems, so an upgrade is required as the readings at the locations tested were below the levels stipulated in BS and TfL standards. In case of a fire, the system is unable to supply water at the required pressure and flow rate to extinguish fires. The requirement of the procurement is to appoint a contractor to undertake works to ensure that fire hydrant systems at the 2 locations are fully operable, in good working condition and in full compliance with relevant safety legislations associated with the hydrant system - BS and TFL standards In line with the Procurement Act 2023, this Contract Award Notice triggers an 8 working day standstill period, as applied automatically by the Find a Tender system. The Authority will not enter into the contract before the end of this
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →