Loading page content…
Loading page content…
the upgrade and on-going maintenance of its Combined Heat and Power (CHP) Systems that are based at the Guy’s and St Thomas’ sites. There are 2 CHP systems in the Trust: • The Guy’s system was installed in 2009. • The St Thomas’ system was installed in 2009. The Guy’s system has reached the end of its operation life and requires immediate replacement. The St Thomas’ system will require replacing in 2031.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →