Loading page content…
Loading page content…
The works comprise a replacement fire alarm installation throughout the hospital. The works have been split into 26 seperate packages of work (plus main Network Loop) and are managed via a JCT Design and Build framework contract agreement. The scope covers retrospective inspection & snagging/de-snagging of the executed fire alarm packages. Works are delivered in a live hospital environment. The works have been split into 26 separate packages of work (plus main network loop) and are managed via a JCT Design and Build framework contract agreement.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →