WP15 Final highways scope The OOC Lane realignment & Final highways scope package consists of: Removal of all existing highway surfacing and street furniture (is there any to be retained / relocated or does it include disposal?) Installation of any temporary critical highway furniture (e.g. Street Lighting, Barriers) required to carry out the works Requirement to maintain a 2m wide footpath to be used by the public throughout the construction of the package, the subcontractor is to include the installation and maintenance of this public footpath, and relocation as required to suit the construction sequence. The excavation of the existing highway down to final formation level, and any other necessary levels required to enable temporary works or sequencing All temporary works required for the construction of the works, including any access requirements Assessments to structures, utilities, properties, which may be affected by the works, as required to satisfy client, Contractor and/or 3rd parties requirements Removal and disposal of all current utilities in t
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →