Loading page content…
Loading page content…
The requirement is for Puretech to undertake the controlled shutdown of the existing Water for Injection (WFI) system and to provide an ongoing support to maintain the system in a safe and stable condition for a limited period thereafter. The contract will begin on 04-Aug-2026 and end on 03-Aug-2029 at a total cost of £38,320 (Including VAT).
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →