Loading page content…
Loading page content…
Supply, deliver and install 1no Daikin VAM 1500J c/w external enclosure located as per the design intend drawing. Ventilation system design to deliver 400 L/S based upon an occupancy of 50 at 8 L/S per person. Supply, deliver & install 2no 1500mm long attenuators on the supply air and return air Supply, deliver and install 4no 250mm 900mm long attenuators fixed to the exhaust and fresh air connections on the VAM. Supply and install 2no 250mm 1phase 3kw inline electric heater battery to the fresh air inlets onto the VAM unit Supply and install galvanised ductwork system generally as per design intent drawing, including big foot frame for Daikin VAM unit and external ductwork. Installation of return air grille and up to 50no 65mm black stainless steel louvred vents as below. Design, supply and install BMS control wiring to VAM unit and new occupancy sensor, connected to the existing BMS system. Update site system and graphics to operate new ventilation system based upon CO2/Temp & occupancy. Supply and install new power supplies to the VAM unit and 2no inline electric heater battery’s. Connection made to existing distribution board. Thermally insulate external ductwork and clad with
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →