Loading page content…
Loading page content…
The contractor shall provide a complete engineered fire detection and suppression system, including all labour, materials, plant, access equipment, design services, testing equipment, certification and documentation necessary to deliver a fully operational system. The protected scope comprises four individual turbine areas within the Turbine Hall. For tendering purposes, each turbine shall be assumed to have an approximate protected area of 15 m², giving an indicative total protected turbine area of approximately 60 m². Tenderers shall verify all dimensions, access constraints, hazard locations and coverage requirements during the site survey and shall base the final design on confirmed site measurements and risk assessment. • Site surveys and risk assessment of the Turbine Hall and protected turbine assets. • Design of the fire detection, alarm interface and suppression system. • Selection and supply of detectors, control panels, suppression equipment, pipework, nozzles, cylinders, pumps, valves, cabling, containment, signage and ancillary equipment. • Installation of all system components, including interfaces with existing fire alarm, plant control, shutdown, ventilation or buil
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →