Loading page content…
Loading page content…
The purpose of this ITT is to appoint a single Charge Point Operator, to deliver Bedford Borough Council's requirements for a "full turnkey" solution to supply, install, connect, commission, operate and maintain a network of charge points on behalf of the Council across the Borough. We expect the winning bidder to deliver a minimum of 512 additional new Electric Vehicle "sockets" (as defined in the Contract at Schedule 4), of which: i) A minimum of 256 sockets to be located at our required sites as set out in Portfolios 1, 2 and 3 (see section 2.2.3 in this document for further information), with our £1.01m subsidy to support installations. ii) Further to this we would like the operator to match and extend our investment through private funding with a minimum additional 256 sockets, at our required sites or at additional sites (to be agreed with the Council). iii) The total minimum delivery of at least 512 additional new Electric Vehicle "sockets." To this end, Bedford Borough Council (BBC) is primarily seeking for its required 256 sockets at the stated locations, a charging solution involving 7kw - 22kw power charge points acro
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →