The facilities at Farington Cricket Club are currently undergoing development, including construction of a new car park. As part of these works, there is a requirement for the installation of Earthworks. The work compromises the following: • Loading and removal of inert material and waste from site and disposal of the same to a licensed waste disposal tip in conjunction with the Waste Code of Practice. The waste is to be tested prior to the start of the works. • Further excavation to reduced levels and disposal of waste to a licensed site. • Excavating to the desired depth as per the drawings. • Installation of filter drain as per the drawings. • Triax Geogrid is to be installed prior to any stone being laid. • Filling to the required levels using imported type 3 MOT (200mm layer).