Loading page content…
Loading page content…
• The Council’s main offices extend to approximately 50,000 square feet and are occupied primarily as office accommodation between 08:00 and 18:00, Monday to Friday, with some out of hours use. • The building is of traditional construction with stone walls, steel frame elements and extensive glazing. The roof structure comprises timber purlins with slate coverings, alongside glazed atria and areas of flat roof. • Heating is currently provided by a series of gas fired boilers (installed within the last five years) serving a wet central heating system comprising a primary distribution loop feeding smaller bore pipework and conventional radiators throughout the building. • There is a central air handling unit serving two large atria. • Local air conditioning units serve some meeting rooms, the council chamber, and critical areas including the server and network rooms which operate continuously. • Hot water is predominantly generated by local electric water heaters. Existing Energy Infrastructure • In 2024 the Council installed a 150 kW solar PV array alongside approximately 180 kWh of battery storage. • Annual electricity generation from the array is approximately 145,000 kWh. • Grid
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →