Loading page content…
Loading page content…
Derry City and Strabane District Council is seeking to appoint a suitably qualified and experienced Contractor to undertake the replacement of the existing boilerhouse control panel with a new Building Management System (BMS) control panel at Riversdale Leisure Centre, 2 Lisnafin Park, Strabane. The new control panel shall be capable of fully controlling the existing boiler plant, heating pumps, ventilation systems, and pool heating plant. It shall also be fully integrated with the Council’s existing BMS infrastructure and be suitable for future connection to a front-end Building Energy Management System (BEMS) system. The existing boilerhouse plant will remain in place, and all services must be maintained throughout the works, with minimal disruption to the day-to-day operation of the facility. The works will include the removal of the existing control panel, installation and integration of the new panel, and all associated wiring, plant interfacing, testing, and commissioning. The Contractor shall ensure that the new control system is fully operational, demonstrated to the Client, and handed over complete with all necessary documentation upon completion. Your submission must be s
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →