Loading page content…
Loading page content…
OHL major refurbishment works carried out at approx. 90km circuits lengths per year, which means a requirement for ground stabilization is required for the purpose of ensuring appropriate load bearing can be placed for heavy plant and equipment as well as reducing our impact on land damage and erosion. The Hirer requires the use of aluminium and plastic temporary roadway to gain access to various sites within the Southern Electric Power Distribution (SEPD) area (and potentially other network areas). The Hirer intends to use the roadways to move vehicles, mobile plant and various lifting equipment to its more remote sites, to which there is no suitable heavy-duty access, all with the purpose of constructing, demolishing, maintaining or refurbishing the Hirer’s network assets.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →