Loading page content…
Loading page content…
Proposed Intrusive Structural Investigations P15511 Stubbington Study Centre - Kitchen & Dining Block Half Term October (26, 27 & 28 October) - Up to 3 Days Duration The investigations will be undertaken jointly with the Structural Engineer and contractor, using a mobile access tower to facilitate safe access to high-level structural elements and roof connections. The building is understood to be an Elliott Medway system-built structure, comprising a lightweight timber-framed construction. The investigations are intended to confirm the existing construction, condition and structural adequacy of the timber frame and associated elements, and to inform future refurbishment proposals. Scope of Investigations The investigations are anticipated to include: Opening up selected internal and external wall areas to expose the timber structural frame. Confirmation of the Elliott Medway construction details, including timber member sizes, spacing and arrangement. Measurement and assessment of timber posts, studs, beams and bracing members. Exposure of timber post bases, sole plates and structural junctions at representative locations. Inspection for timber decay, rot, moisture ingress, insect
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →