Footpath enhancement works and the supply of all required materials to facilitate those works as described within the specification in Section 4. This is to include: • Installation of 65 linear meters of stone pitching • Appointment as Principal Designer and Principal Contractor Duty Holder in relation to Construction (Design & Management) Regulations 2015 • The provision of all materials to facilitate the works. • Transport of materials to and from site (it is anticipated that all materials will be needed to be transported via a helicopter lift, please note there is no vehicle access to the construction zone) • Cross drains suitable for a bridleway (if required) and landscaping. • Removal of all waste and arisings from site in accordance with relevant legislation.