Loading page content…
Loading page content…
In brief, this project seeks to update the TPSRTM2 model to a new baseline of 2025 and provide a new set of forecasts. The baseline will reflect post-COVID travel conditions which will then be carried through into the forecasts. The refreshed models will then provide a better evidential basis to support their existing use cases, as well as new and emerging use cases, as detailed in Section 110. The models are required to be developed as far as is practicable in accordance with the guidance contained in TAG. The models should be calibrated and validated in line with the criteria developed for the second RTMs, with the intention to equal or improve on the second generation RTMs' calibration and validation performance. While delivering the service, the Consultant will: - Lead upon the Network Technical Consistency Group. The main activities in the Network TCG will be ensuring a consistent approach to reviewing and updating networks is adopted by each RTM. - Lead upon the Forecasting Technical Consistency Group. The main activities under the End User TCG will be to agree upon the forecasting methodology utilised in RTM3 and ensuring a consistent approach to realism testing. - I
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →