Loading page content…
Loading page content…
Description of the Contract TfL intends to award this contract directly under section 41 and Schedule 5, paragraphs 7(a) and 7(b) of the Procurement Act 2023, because competition is absent for objective technical reasons and only Hagenscheidt MFG (UK) Limited can supply the requirement. The existing wheel lathe installation at Ruislip depot, including the foundation pit, rail interfaces and control systems, is specific to Hagenscheidt equipment. A lathe from any other manufacturer would require substantial civil and system re-engineering, a significantly longer outage of a critical depot asset and disproportionate cost and safety risk. There is no reasonable alternative or substitute, and the absence of competition is not the result of an artificial narrowing of the requirement. The contract will not be awarded until after the 8-working-day standstill period. The Wheel Lathe is a critical maintenance asset supporting wheel reprofiling activities required to maintain rolling stock wheelsets, fleet availability and operational reliability across the London Underground network. The contract includes: Manufacture and supply of a replacement Hegenscheidt MobiTurn Wheel Lathe. Delivery
Create a free account to read the full notice and search for similar work. When you need help writing and reviewing a bid, you can choose a paid plan. No card needed to start searching.
Continue with this notice →