Loading page content…
Loading page content…
The contract is for the removal and replacement of an existing carriageway/footway expansion joint and 36 no existing bridge bearings at the A2041 Harrow Manorway Abbey Wood Flyover. 20 no bearings for Span 4/5 have been designed by the Client's consultant. The Contractor is required to design the remaining 16 no bearings for Spans 1 to 4. Extensive concrete repair works are required in conjunction with the installation of the new bearings. Extensive temporary works will be required to allow the removal and replacement of the bearings.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →