Loading page content…
Loading page content…
The work will involve the removal and replacement of the existing oil-fired heating boilers and associated plant within the existing boiler house. The works shall include, but not be limited to: • Removal and disposal of existing oil-fired boilers, associated flues and redundant ancillary equipment • Retention of the existing low loss header and secondary heating distribution once leaving the plantroom and pressurisation equipment where serviceable. • Installation of 2no. new high efficiency condensing kerosene-fired boilers complete with flue systems, condensate drainage and associated ancillary equipment. • Replacement of existing boiler shunt pump set and heating circulation pump sets with new high efficiency ECM pumps. • Replacement of the existing boiler control panel and associated controls. • Modification of existing boiler house pipework and oil supply pipework to suit the replacement plant. • Renewal of exposed secondary heating flow and return pipework between the retained low loss header and the points where the services enter the ground for distribution throughout the building. • Removal and replacement of identified classroom radiators/convectors with low surface tempe
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →