Loading page content…
Loading page content…
The Works The Civil and Electrical Bill of Quantities issued as part of this tender package detail all aspects of the project. The main items of project work are as listed below: - 1.Carry out a full Asbestos Refurbishment / Demolition Survey on all NLB operational buildings prior to the commencement of any work. The survey, sample collection and sample analysis must be carried by a UKAS accredited contractor in accordance with ISO 17020, ISO 17025 and Health and Safety Executive Guidance Notes; HSG 248, Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and HSG264, Asbestos: The survey guide. 2.The Principal Contractor is expected to test the existing ‘HCL’ fall arrest system and re-certify it, if necessary, before use. The Principal Contractor is to provide the Project Leader with all relevant test certification for record and audit purposes. 3.Establish temporary light. 4.Deliver all plant/materials/camp to NLB Oban packaged for helicopter underslinging. 5.Land plant/materials/camp on site and establish site. 6.Replacement of balcony handrail and metal deck floor in watch room. 7.Upgrade of electrical installation. 8.Upgrade of AtoN and power supply.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →