Loading page content…
Loading page content…
The scope of works includes a two-stage delivery approach covering the complete design, supply, configuration, integration, testing and installation of the Building Management System for Canley Brook, Burton Green and Stoneleigh Pumping Stations under the HS2 N1/N2 MEICA works. The centralised system at each location shall comprise of a dedicated BMS panel with dual-redundant PLCs, HMIs, remote interface enclosures and a dedicated BMS LAN, and distributed interface enclosures located within the relevant plant rooms to facilitate communications between plant systems and provide connectivity to the HS2 Network Integrated Control Centre (NICC). The BMS shall integrate the mechanical and electrical building services, providing monitoring, control, alarm management, and operator interfaces for the pumping stations and portal building. The system shall be designed in accordance with the project control strategy and applicable HS2 technical standards while coordinating with interfacing subcontractors to ensure seamless integration of all connected systems. The proposed BMS shall provide monitoring, control, alarms and graphical visualisation f
Create a free account to read the full notice and search for similar work. When you need help writing and reviewing a bid, you can choose a paid plan. No card needed to start searching.
Continue with this notice →