Loading page content…
Loading page content…
The CoLC, in collaboration with CoLC of London Police (CoLP) are undertaking a project to build a Tactical Firearm Training Facility (TFTF). A suitable site owned by CoLC at Dagenham Dock has been identified. A feasibility study was undertaken to determine the viability of the site, to evaluate cost and programme differences as well as assessing the pros and cons of either a full traditional build approach or full modular scheme to provide the new TFTF. In conclusion , it was determined that a combination of both traditional and modular design solutions is to be considered as the favoured approach to provide the most efficient and operationally effective solution. The design scheme produced during the feasibility study is to progress from RIBA stages 1 to 3, however elements of this design are incomplete and there is a requirement for the appointed design team to review the existing information/design and provide appropriate advice/expertise as to what extent the current packages are progressed further to provide a complete RIBA stage 1 and review then progress RIBA stage 2 and 3 design before commencing the RIBA stage 4. Contract duration is 3.6 years. This appointment is for Pr
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →