Loading page content…
Loading page content…
United Utilities is looking to re-procure its current framework for Flow and Asset Management Surveys. The framework will constitute 2 Lots: Lot 1 - Wastewater Network Asset Surveys Lot 2 - Flow & Water Quality Surveys Services required under the Lots are as follows: Lot 1: a) Manhole Surveys b) Pumping Station Surveys c) Combined Sewer Overflow ("CSO") Surveys d) Impermeability Surveys e) Drainage Connectivity Surveys Lot 2 services will be required in river, in sewer and in waste water treatment works (WwTW) as follows: a) installing sewer depth and flow monitors, b) river depth monitors, c) river stage boards, d) rain gauges, e) portable wastewater samplers, f) dissolved oxygen/temperature monitors, g) monitoring the equipment either continuously or for wet weather and dry weather events. h) all telemetry raw data, with the exception of rain gauges to be capable of being viewed live via a website and downloaded by the Procurer at all times. i) collection and processing of data in accordance with the requirements of the Call-Off Particulars of the required Survey, and j) production of reports in accordance with the requirements of the Call-Off Particulars of the required Survey.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →