Loading page content…
Loading page content…
The playground is located on the Village Green in the village centre. (///reckoned.wacky.ears). The current wetpour is now failing in several areas, and the sub-base is failing in several areas causing unevenness. The current surface was replaced as part of a playground restoration project in 2012. Another area of the playground is now surfaced with bonded rubber woodchip effect and this has worked well on the heavy clay soil that is susceptible to movement. This is our preferred surface material. Works to comprise but not limited to: Provide suitable Heras fencing (or similar), welfare for your team, equipment and all materials including security for duration of the Works. Remove existing including disposal of all brick edging and wetpour surface and relay with new material to comply with requirement stated herein. Removal and disposal of all existing wetpour estimated at 275m2 but all tendering contractors are to make their own judgement on quantities. Excavate all areas below where wetpour was removed, supply, lay including full compaction of no less than 100mm depth MOT Type 1 stone. Supply and lay no less than 275m2 area at minimum depth 40mm of re-chipped/recycled clean rubbe
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →