Loading page content…
Loading page content…
A multi-disciplinary engineer team is sought to support the design of the permanent scheme of the Oxford Street Transformation Project (OSTP). During the project period covering RIBA stages 2 and 3, the engineer will be required to work alongside the design team (East) to develop a concept and coordinated design, after which a period of coordination with TfL and then review of RIBA 4 detailed design (by others) will be required.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →