The design, manufacture, supply, installation and commissioning of - SGS Phase 5 Control Panel Replacement 2026/27 3 No. MCC dual pump Control Panels and 3 No. Single pump control panels including associated works. Partial decommissioning of MCC on one redundant borehole site. (At the Client's sole discretion, SGS Phase 1 Control Panel Replacement 2027/28 and SGS Phase 2 Control Panel Replacement 2028/29 below may be instructed via Compensation Event) SGS Phase 1 Control Panel Replacement 2027/28 2 No. MCC dual pump Control Panels and 5 No. Single pump control panels including associated works. Partial decommissioning of MCC on one redundant borehole site. SGS Phase 2 Control Panel Replacement 2028/29 1 No. MCC dual pump Control Panels and 8 No. Single pump control panels including associated works.