Loading page content…
Loading page content…
MEPH 1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner. 2. Survey and report on condition of existing services in the Phase 1 areas that are being retained 3. Enabling works and decommissioning of Phase 1 works 4. CCTV Survey of existing drainage/rainwater stacks 5. Above ground soil & waste drainage consisting of new pipework, thermal and acoustic insulation, chlorination and treatment 6. Above ground rainwater drainage system consisting of new pipework, thermal and acoustic insulation, sump pump 7. Supply and installation of sanitaryware including, but not limited to WCs, sinks, taps 8. Domestic cold water services including mains supply, boosted distribution, storage tank, booster set, pumps, conditioner, trac
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →