Loading page content…
Loading page content…
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of suspended bowl pumps for Mautby Water Level Management Improvements (WLMI) project. It also allows the optionality of awarding a contract for one additional similar pumping station site namely Stokesby WLMI at a future date. Any instruction for the additional site is expected to be within 12-24 months of the Contract Date. The value is estimated at £500,000 - £625,000 for the initial site with up to a further £500,000 - £625,000 for the additional site. These figures are exclusive of VAT. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design head. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for Mautby pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Mana
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →