Loading page content…
Loading page content…
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on: • The reuse of tunnel sump water for tunnel wall washing. • The reuse of building roof and waste water for flushing building toilets and use in sinks and showers. The Contractor shall undertake the feasibility study following RIBA stages: • RIBA stage 0 - Strategic Definition. • RIBA stage 1 - Preparation and Briefing. • RIBA stage 2 - Concept Design. The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of the tunnel washing operations
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →