Loading page content…
Loading page content…
The build of a new standalone modular Key Stage 2 classroom (or double classroom) at Witheridge C of E Academy with a covered walkway to link back to the main building. - Minimum teaching space of 55m2 (per classroom if double) - 2 Toilets provided, one of which to be disabled - Cloakroom area included in design - Storeroom provision included in design - Covered walkway to link back to the main building - Building works including ground clearance and ground preparation - Survey and design including planning permission and building regulations - Project management costs including technical advice and full CMD. A site visit is available on Thursday 18th June - please contact us via the tender portal to arrange.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →