Loading page content…
Loading page content…
The works are to install dropped crossing points with concrete buff tactile paving at the following locations as detailed on drawings SPM- HC - S106 -120 -24-100-000 SPM - S106 -120 -24 - 100 -001a Suppliers are required to price the BOQ and include for all traffic management. It is highly recommended that the PCI pack is studied, and a site visit takes place before submitting quote. A proposed programme of work should also be submitted with your tender. These works are being funded, delivered and managed through the Herefordshire S106 Team directly. S106 contributions by their very nature are a finite budget which require the project to obtain a high level of value engineering at every stage of the project's lifecycle.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →