The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database) • All instrumentation is expected to be battery or solar powered • Compliance with relevant industry standards and regulatory requirements • Joint Ventures/Alliances will be considered Packages of work area as follows: InSAR Satellite • Provision of historical data to cover the area of Sizewell B and Sizewell C. • Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended). Unit 1 and 2 Plastic Wall Monitoring • Commence September 2026, end June 2027 • Drilling of approx. 200nr installation boreholes to a depth of 55m below ground level • Installation of IPI, IPIX, VWP and GNSS positional location monitoring Unit 1 and 2 Retaining Walls • Commence September 2026, end January
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →