Loading page content…
Loading page content…
The total value of this contract is indicative only and has been provided as a ceiling amount for transparency purposes. This work has been made as a direct award as it is a continuation of the IMO Fire Door Works - Phase 1 Riser Doors, the scope of the tendered work comprised: • Replacement of timber riser doors within Cores A, B and C. • Replacement of timber stairwell entrance doors within Core A. • Maintenance and repair works to timber stairwell entrance doors within Cores B and C. The outline scope of works following the above contractors design portion shall comprise, but is not limited to, the following: • All repairs and replacement of fire doors The contractor is independently responsible for assessing the condition of all fire doors within the scope and ensuring that all works are completed in accordance with relevant standards and certification requirements. As part of the condition assessment, opening up architraves revealed concerns in existing fire-resisting construction and substrate. An independent fire engineer was appointed to review the situation and assess the proposed remedial work. The work covered by this direct award is to undertake the approve
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →