Loading page content…
Loading page content…
The work for HM10 - Highways and footway reactive maintenance will be at separate sites described in the Task Orders, located anywhere within the Metropolitan Borough of Sefton. Anticipated works type to be undertaken under the proposed contract: • Footway maintenance activities, including isolated repairs. Footway materials may include bituminous, p.c. flags, Southport tiles, blockwork, p.c kerbs and edgings. Adjustment of utilities covers and other ironworks may also be included. • Carriageway maintenance activities, including isolated repairs, patching and reinstatement of road markings. • Maintenance of Road Restraint systems • Trial Pits within the highway boundary • Out of Hours Call Out: After 1600 hours (Monday to Friday) and for the full 24-hour period on Saturdays, Sundays and Public Holidays the Authority operates a night security service. The Contactor shall provide out of hours call out during any Christmas Shutdown period. Any work required by the service, under this Contract, shall be issued verbally to the Contractors 'call out team(s)' who are required to attend site within 1 hour of the call being made. • Assistance with Winter Gritting/Snow Clearance Operations:
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →