Loading page content…
Loading page content…
WM Trains Limited is procuring rail depot and servicing works through one advertised works procurement structured in two contractual stages. Stage 1: PCSA Under the Pre-Construction Services Agreement (PCSA), the contractor will complete the GRIP 5 design, further develop the design, and price the individual works packages. Stage 2: ECC Once those package prices have been developed and consolidated into a single commercial position, the project will proceed to award the NEC4 Engineering and Construction Contract (ECC) on a lump-sum basis for GRIP stages 6 - 8. The procurement is intended to appoint a contractor for each Lot to provide Stage 1 PCSA services. Stage 2 may follow, subject to the contracting authority's decision, funding, approvals and procurement compliance requirements. The contracting authority does not commit by this notice to award Stage 2. Please note that it may not be necessary for the successful bidder for each Lot at Stage 1 to undertake all of the GRIP 5 design required for that particular Lot as some elements of the GRIP 5 design may already have been completed by tender award stage. If that is the case, it would be expected that the successful bidder would
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →