Loading page content…
Loading page content…
Lot 1 requirements include Design and Flood Risk Activity Permit application support relating to the Resurfacing and Bench installation Works Footbridge Replacement, Pond Dredging, Fishing Platform and Paddle Sports Launch Platform installation Works at Train Wood. Lot 2 requirements include Design and Flood Risk Activity Permit application support relating to the Resurfacing and Bench installation Work. Resurfacing and Bench installation Works at Train Wood Norwich. Please note that these works are subject to receiving an Environment Agency Flood Risk Activity Permit (FRAP) and therefore the contract will be split into three parts. • Part 1: The Contractor will be required to provide detailed designs and appropriate documentation to Norfolk County Council and may be used to support the Environment Agency permit application • Part 2: The Contractor to supply and install the agreed infrastructure, including mobilisation costs • Part 3: Additional works that NCC may instruct, subject to funding availability and approval, to be progressed through detailed design (if designs are required) and for supply and installation works. Important: For both Lots 1 and 2, the award of Part 1 does
Create a free account to read the full notice and search for similar work. When you need help writing and reviewing a bid, you can choose a paid plan. No card needed to start searching.
Continue with this notice →