Loading page content…
Loading page content…
Scottish Hydro Electric Power Distribution plc and Southern Electric Power Distribution plc (SSEN) intends to establish multi-supplier Framework Agreements for the design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed primary switchgear for use across the SSEN Distribution network. The Framework will support asset replacement, network reinforcement, customer connections and strategic investment programmes throughout the remainder of ED2, ED3 and the early years of ED4. Current planning assumptions indicate forecast demand of approximately 2,600 switchgear panels over the anticipated Framework lifecycle, although these volumes are indicative only and no minimum volume or value of work is guaranteed. The procurement is structured across four lots: Lot 1: Conventional CT/VT Fixed-Pattern Switchgear Lot 2: LPIT-Enabled Fixed-Pattern Switchgear Lot 3: Conventional CT/VT Withdrawable Switchgear Lot 4: LPIT-Enabled Withdrawable Switchgear The Framework will support SSEN's wider switchgear standardisation strategy, intended to improve affordability, manufacturing efficiency, security of supply, supply-chain resilience, lead-time performance and whole-life asset va
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →