Loading page content…
Loading page content…
The following rectification measure to the Upper West Gate are proposed by Hampshire County Council's Property Services Department. Primary Measures The left-hand side gate leaf (when viewed from within the Fort), will be dismantled and transported to a specialist metal worker/fabricator's workshop for adjustment to the width of the gate to alleviated the 'pinch point' with the hinges. Following reinstatement of the gate leaf, both gate leaves will be adjusted to ensure they are fully operational, including ensuring they are square, horizontally and vertically level and 'free moving'. (Fig 14) Secondary Measures The full refurbishment of 4 No. wheels located at the base of the gates. (Fig 16 &17). The full refurbishment of all the hinges (3 no. to each gate, 6 no. total). (Fig 15) Aligning the holes in the sliding steel rail with the steel brackets bolted to the gate leaves, to allow the padlocks to be easily installed. (Fig 12). Installing new galvanised steel sockets (utilised for housing the gate's drop bolts) fitted flush to the concrete road surface to easy operation of the drop bolts. (Fig 18). The installation of four steel brackets firmly secured to the gate leaf surfaces t
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →