The Fleet Solid Support (FSS) Programme requires 240 Ship Support Replenishment at Sea (RAS) Vehicles (SSRVs) to enable the full capability of the three Royal Fleet Auxiliary (RFA) ships. A total of 240 SSRVs are required for the x3 FSS ships, training and spares. Indicative manufacturing delivery timescales are as follows: Training - January 2029 - Qty 10 Ship 1 - Autumn 2030 - Qty 80 Ship 2 - Autumn 2031 - Qty 80 Ship 3 - Autumn 2032 - Qty 70