Loading page content…
Loading page content…
The appointment of a contractor to complete the retrofit of the Law (LAWPL) and Tower (PSYCH) buildings. Scope of works required at Law Building include: • Asbestos Removals. • Replacement of existing flat roof systems on both the main section of the building (including the lift motor/plant room) and the lower-level extension built in the 1990s. To facilitate these works roof top PV cells and MEP systems will need to be removed and re installed (including recommissioning). • Removal of all existing windows and curtain walling (frames & windows) and Page 2 to 6 replacement with new double-glazed units and associated making good (except for the existing double glazed units on the ground floor of the 1990's courtyard extension). • FF&E - installation of new replacement windows blinds. Scope of works required at Tower Building included: • Asbestos removals. • Replacement of existing flat roof systems on the no.2 lower-level extensions only (not including the main roof which has recently been replaced). To facilitate these works roof top MEP systems will need to be removed and re-installed (including recommissioning). • Removal of all existing windows and curtain walling (frames & windo
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →