Loading page content…
Loading page content…
2. The Service 2.1 The Contractor shall provide the following service to the Client for the duration of the service period: 2.2 Design of x3 replacement gantry crane operator cabs 2.3 Fabrication of x3 cabs once design approved 2.4 Replacement/installation of x3 cabs once fabricated 2.5 Commissioning of x3 cabs once installed. 3 Specification/Requirements: 3.1 Replacement/installation of x3 cabs once fabricated 3.2 Cabs will be designed to fix to the existing crane structure as a direct replacement. 3.3 Cab Specification:- • Construction of 3 mm steel plate. • Internally reinforced with steel profiles and lined with 0.7 mm galvanized, plastisol-coated steel plate on walls and ceiling. • 250 mm raised floor for cable routing. • Steel plate floor covered with profiled rubber mat. • Walls and ceiling insulated with 45 mm mineral wool. • All windows made of 6 mm green tint toughened safety glass. • Floor window without tint • Incl. document holder and coat hook • Surface treatment - C3H 180 μm: • Entrance door with full window made of 6mm toughened safety glass, green tint • Additional glass in side and rear made of 6mm toughened glass, green-tinted • Terminal cabinet including
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →