The works comprise the detailed design, construction, testing and commissioning of a new foul sewer system to replace the existing on site sewage treatment arrangements at High Lodge. The works include the provision of an approximately 2,037 m foul sewer system, comprising: • Rising/pumping main • gravity sewer main • pumping station • holding tank • a connection to the existing Anglian Water foul sewer network. The works are provided along the pre determined route identified by Forestry England.