Loading page content…
Loading page content…
The Transfer Corridor plant and equipment provide critical infrastructure to support the safe and efficient operation, and capability, of the future main construction works at the Transfer Corridor and wider Shaft and Silo programme. Scope consists of: - Maturation of scheme design to final design, - Manufacture of the Plant and Equipment - Factory Acceptance Testing (FAT) - Creation of supplementary operational and maintenance documentation - Delivery of the final manufactured and assured Plant and Equipment - Possible Storage solutions either within contractual timescales or within the plus one-year arrangement
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →