Loading page content…
Loading page content…
Groundworks for a Multi-Use Games Area, including: Preliminaries Excavation and foundations Base construction Paths Hard and soft landscaping The works shall be carried out in accordance with the requirements of the specifications within this Schedule of Works and the contract documents. In the event of discepancy the Schedule of Works shall take precedence. Quantities stated within this Schedule can be relied upon by the contractor. All volumes stated are unbulked. Tenders should be based on the details included in the following document bundle: a. Sky Revolutions drawing reference SRL221552 [Topographical Survey] b. PBA Planning drawing reference WPC-CP-01 REV C [Existing layout plan] c. PBA Planning drawing reference WPC-CP-05 [External works plan] d. PBA Planning drawing reference WPC-CP-06 [Cross Sections - 200mm excavation] e. PBA Planning drawing reference WPC-CP-07 [Cross Sections - 500mm excavation] f. PJC document reference PJC/6393/24-02 [Arboricultural impact assessment, method statement and tree protection plan] g. WPC-CP-CEMP [Construction Environment and Management Plan] h. Pluviam drawing reference PN0237-PEL-XX-XX-DR-Y-0001 B [Drainage Plan] i. Zaun Supe
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →