Loading page content…
Loading page content…
Cwm Taf Morgannwg University Health Board (CTMUHB) have awarded a Lead Consultant to undertake a comprehensive survey, assessment, and prioritised upgrade plan for the High Voltage (HV) and Low Voltage (LV) electrical infrastructure at the Princess of Wales Hospital, Bridgend. The hospital's existing electrical infrastructure, dating from approximately 1985, contains several single points of failure across both HV and LV systems, including ageing switchgear, insufficient resilience, and limited standby generation capacity. The appointed consultant will be required to carry out a full technical survey of the HV/LV network, standby generators, and associated infrastructure; identify risk-critical defects; and develop high-level costed solutions aligned with Welsh Health Technical Memoranda (WHTM). The Lead Consultant will act as Lead Designer to develop and deliver approved short-term works aimed at improving resilience and reducing the immediate risk of supply failure. Duties will include preparation of design specifications, contractor competence assessment, tender documentation, project management, contract administration, site supervision, and oversight of testing and commissioni
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →