Loading page content…
Loading page content…
This procurement relates to the supply, commissioning and maintenance support of Combined Heat and Power (CHP) engines across multiple Thames Water wastewater treatment sites to maximise engine availability / performance. The scope includes the provision of new CHP units and associated services to support operational efficiency and energy recovery, as well as spare parts stock holding and technical support. Objectives and Expected Outcomes Effective utilisation of the biogas produced during the treatment of sludge, minimising flaring of gas, maximising electrical heat and power production • Securing Capacity: Ensure supply of CHP Engine requirement through AMP 8 and AMP9 • Standardisation: Promote consistency across the CHP estate to reduce complexity and improve asset availability • Commercial Value: Leverage volume-based incentives and long-term value through strategic sourcing • Serviceability: Ensure availability of cost-effective spare parts and technical support • Efficiency & Sustainability: Support energy recovery and carbon reduction goals by securing high-performance, low-emission CHP solutions • Regulatory Changes: Ensure compliance with evolving regulatory requirements
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →