Loading page content…
Loading page content…
The C10 Overhaul Heavy Maintenance programme is due in 2026 to be performed on the Angel Class 172/0/1 fleet currently on a dry lease with WM Trains. As such, heavy maintenance arrangements are the responsibility of WM Trains and some of the jobs within the C10 specification WMT/172/HM Issue:1 require specialist external supplier support. An agreement with Wabtec for the Brake Raft Overhaul (job BR 0007) element of the C10 overhaul of Class 172/0/1 is required as WM Trains do not have the relevant IP to perform this.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →