Loading page content…
Loading page content…
The proposed works comprise the complete refurbishment of two existing WC facilities, including removal of existing sanitaryware, cubicles, wall and floor finishes, and associated fittings. The contractor shall undertake all necessary design development, supply and installation of new sanitaryware, IPS duct panelling, cubicles, vanity units, hygienic wall cladding, safety flooring, fire-rated doors and associated mechanical, plumbing and electrical modifications. Works shall include modifications to hot and cold water services, drainage, isolation arrangements, commissioning, testing and certification, in accordance with applicable Building Regulations, NHS HTM/HBN guidance and Trust requirements. The corridor works comprise removal of existing flooring throughout the designated ground-floor corridor areas identified on the tender drawings, preparation and levelling of substrates, and installation of new Altro Reliance 25 heavy-duty safety vinyl flooring, including coved skirtings, junction details, stair trims and replacement entrance matting. All works shall be carefully phased to maintain safe access, clinical operations and circulation throughout the hospital. Contractors sh
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →